Infrastructure & specifications
A park that
delivers on its specs.
Aeropark's technical information translates into concrete operational advantages. No ambiguity in feasibilities, no surprises in utilities.
Construction progress
The development, in motion.
Recent aerial footage of the park: the scale of the masterplan from above and earthworks underway.
Aerial view of the park
Flyover of Aeropark II and the lot layout
Earthworks
Grading and urbanization in progress
Technical specifications
Everything included from day one.
Every lot in Aeropark II includes full access to the park's infrastructure from the moment of title transfer.
- Industrial lots starting at 1,000 m² of land area
- Three-phase power with electrical feasibility confirmed at the development level
- Road infrastructure for two-lane circulation and heavy freight
- Main access with guardhouse and vehicle entry control
- Integrated wastewater treatment plant within the development
- Underground utilities: drainage, drinking water, telecommunications
Three-phase power
Three-phase electrical supply with capacity for industrial requirements. Electrical feasibility confirmed at the development level.
24/7 Security
Controlled main access with guardhouse, defined perimeter, and entry protocols for sensitive operations and high vehicle traffic.
Wastewater treatment plant
Integrated wastewater treatment system built into the masterplan. Regulatory compliance from the design phase.
Road infrastructure
Internal roads designed for heavy freight transport. Layout supports two-lane circulation and efficient turning radii.
Building regulations
Construction guidelines ensuring coherence, property value, and operational compatibility among all park users.
Underground utilities
Drinking water, industrial drainage, street lighting, and telecommunications integrated into the masterplan from construction start.
Power · Electrical substation
A dedicated substation
as a differentiator.
Aeropark II runs on a dedicated Enerpyme substation with 450 MVA installed and 250 MVA available for new users. Infrastructure designed to support high-demand industrial operations.
Substation sheet
Operated by Enerpyme- Operator
- Enerpyme
- Installed capacity
- 450 MVA
- Available capacity
- 250 MVA
- Transformation
- 400 kV → 115 kV → 34.5 kV (up to 100 MVA at LV)
- Redundancy
- Ring topology at 115 kV (not applicable at 34.5 kV)
Querétaro regional ecosystem
Not an isolated park.
The center of the corridor.
Aeropark II is surrounded by the most important industrial parks in the Bajío and the most active companies in the global aerospace and automotive sectors.
› Nearby industrial parks
› Companies present in Querétaro's industrial ecosystem
Need the detailed technical specifications?
The commercial team can send the complete project technical brief.